Installation of a 1500 ton chiller, one of the largest chillers in the Tidewater area also
included installation of two cooling towers, chill water and condenser water
piping. |
|

|
 |

All HVAC and plumbing for 220,000 square foot building, including 450 plumbing fixtures,
5 boilers, 1 850 ton chiller, 2 cooling towers, 11 air handling units, 4 axial vane fans,
9 cabinet heaters, 2 split systems, 8 variable frequency drivers, all plumbing and piping
for 12 concession stands, sheet metal, insulation and temperature controls. Facility seats 12,000 for functions and ODU home basketball games. |
|
“Bay Side Contracting provided S.B. Ballard Construction Company mechanical
and plumbing contracting services for the Ted Constant Convocation Center.
They played a vital role in the success of this project and were among a group
of subcontractors who elevated this project to be a premier icon of the Hampton
Roads landscape. We thank Bay Side Contracting for their valuable role in this
endeavor.” Stephen B. Ballard, S.B. Ballard Construction Company
General Contractor |
|

|
 |

All HVAC and plumbing for a six story office building, including 8 air handling units,
2 cooling towers, 188 VAV boxes, humidifiers, frequency driven pumping package,
122 plumbing fixtures, 5 boilers, domestic water booster package, energy recovery
unit, computer room units, water filtration system, unit heaters, sheet metal, insulation
and temperature controls. Hampton School Board and Hampton City officials occupy this building. |
|
|
|